JLR - Daily Pouring Schedule

Scheduler Next Day

CUSTOMER VOLUME TIME REMARKS
QUIRANTE CONSTRUCTION CORPORATION
25HD0162 FLOOD CONTROL PANGDAN
BRGY. PANGDAN CITY OF NAGA / 17.5KM
14.0 1200 COS
3000 3/4 28D S4
BACKHOE BUCKET FACE WALL 1A-10036121
CEBU SOUTH HARBOR AND CONTAINER TERMINAL CORPORATION
CSHCTC SITE DEVELOPMENT
SRP, TALISAY CITY
100.0 1300 COS
6000 G1 7D S4
DP PAVEMENT 1A-10035418

Copyright © 2012 - JLR Construction and Aggregates Inc. - Ralph

Legend
BACKHOE BUCKET DP OVER ALL
14.0 m³ 100.0 m³ 114.0 m³

CUSTOMER NAME / PROJECT / LOCATION OTHERS
(all)
PSI AGG CURING SLUMP POURING STRUCTURE VIBRATOR/
SAMPLER
REMARKS VOLUME DATE TIME STATUS FORM # ACTION

7 QUIRANTE CONSTRUCTION CORPORATION

25HD0162 FLOOD CONTROL PANGDAN

BRGY. PANGDAN CITY OF NAGA / 17.5KM

Hide
3000 3/4 28D S4
  
14.0

2026-03-27

1735

10036121   

CEBU SOUTH HARBOR AND CONTAINER TERMINAL CORPORATION

CSHCTC SITE DEVELOPMENT

SRP, TALISAY CITY

Hide
6000 G1 7D S4
  
100.0

2026-02-26

1331

10035418   



CUSTOMER NAME / PROJECT / LOCATION PO # PSI AGG CURING SLUMP POURING STRUCTURE REMARKS EST VOLUME DATE TIME FORM # STATUS ACTION

QUIRANTE CONSTRUCTION CORPORATION

25HD0162 FLOOD CONTROL PANGDAN

BRGY. PANGDAN CITY OF NAGA / 17.5KM

OTHER REMARKS

Contract#25-08-220rev2,PO#21659

Pipes :

Vibrator :

Slumpcone :

Beam :


21659 3000 3/4 28D S4 BACKHOE BUCKET FACE WALL COS 14.0

2026-03-27

2026-04-11

1735

1200

10036121 Okay Unapproved

CEBU SOUTH HARBOR AND CONTAINER TERMINAL CORPORATION

CSHCTC SITE DEVELOPMENT

SRP, TALISAY CITY

OTHER REMARKS

Contract#24-11-295_Rev5,PO#1575

Pipes :

Vibrator :

Slumpcone :

Beam :


1575 6000 G1 7D S4 DP PAVEMENT COS 100.0

2026-02-26

2026-04-11

1331

1300

10035418 Okay Unapproved